United Kingdom Atomic Energy Authority
Notice range from 16 August 2017 to 21 May 2022.
03 June 2020
Cryogenic Material Data Capture Tender - Tender
15 May 2020
Larger Magnet Manufacturing and Testing Considerations Study - Tender
12 May 2020
UKAEA Engineering Design Services Framework - Award
03 August 2020
STEP B1.6 SCO2 Component Level Cycle Technology Assessment - Tender
20 August 2020
STEP Cost Modelling Partner - Tender
21 August 2020
STEP B1.3 Vacuum Vessel State of the Art and Best Practice Study - Tender
12 October 2020
Larger Magnet Manufacturing and Testing Considerations Study - Award
13 October 2020
Cryogenic Material Data Capture Tender - Award
20 October 2020
STEP B1.3 Vacuum Vessel State of the Art and Best Practice Study - Award
23 November 2020
STEP Cost Modelling Partner - Award
14 December 2020
STEP B1.6 SCO2 Component Level Cycle Technology Assessment - Award
11 January 2021
STEP IVC - FEED and Detailed Design Study for liquid metals and molten salts corrosion test rig - Award
04 February 2020
UKAEA Engineering Design Services Framework - Tender
10 January 2020
STEP WP5 - Lead-Lithium Flow Loop Concept Study - Award
02 December 2019
STEP WP5 - Fusion Power Plant - Breeder Blanket Design Challenge - Award
29 November 2019
STEP WP5 - Heat Pipe Design Challenge - Award
22 November 2019
STEP WP5 - Fusion Power Plant - Diverter Heat Exchanger Design Challenge - Award
07 November 2019
STEP WP5 - Lead-Lithium Flow Loop Concept Study - Tender
07 November 2019
STEP WP5 - Repair of RNC Task 5.5.2 - Award
31 October 2019
Fusion Steels Study - Award
31 October 2019
STEP WP11 - Feasibility Study into the use of anodised aluminium magnets in fusion reactors - Award
07 October 2019
STEP WP5 - Heat Pipe Design Challenge - Tender
04 October 2019
STEP WP5 - Fusion Power Plant - Diverter Heat Exchanger Design Challenge - Tender
03 October 2019
STEP WP5 - Fusion Power Plant - Breeder Blanket Design Challenge - Tender
02 October 2019
STEP WP11 - Feasibility Study of Modular Reactor Designs - Award
23 September 2019
STEP WP5 - Repair of RNC Task 5.5.2 - Tender
20 September 2019
Fusion Steels Study - Tender
03 September 2019
STEP WP11 - Feasibility Study into the use of anodised aluminium magnets in fusion reactors - Tender
16 August 2019
STEP WP11 - Feasibility Study of Modular Reactor Designs - Tender
26 June 2019
Provision of Architectural Consultancy Support - Tender
23 April 2021
Metal Melting/Casting Test Rig - Tender
17 August 2021
Metal Melting/Casting Test Rig - Award