List Notices

United Kingdom Atomic Energy Authority

Notice range from 08 January 2018 to 21 October 2021.

17 August 2021Metal Melting/Casting Test RigAward
23 April 2021Metal Melting/Casting Test RigTender
26 June 2019Provision of Architectural Consultancy SupportTender
16 August 2019STEP WP11 - Feasibility Study of Modular Reactor DesignsTender
03 September 2019STEP WP11 - Feasibility Study into the use of anodised aluminium magnets in fusion reactorsTender
20 September 2019Fusion Steels StudyTender
23 September 2019STEP WP5 - Repair of RNC Task 5.5.2Tender
02 October 2019STEP WP11 - Feasibility Study of Modular Reactor DesignsAward
03 October 2019STEP WP5 - Fusion Power Plant - Breeder Blanket Design ChallengeTender
04 October 2019STEP WP5 - Fusion Power Plant - Diverter Heat Exchanger Design ChallengeTender
07 October 2019STEP WP5 - Heat Pipe Design ChallengeTender
31 October 2019STEP WP11 - Feasibility Study into the use of anodised aluminium magnets in fusion reactorsAward
31 October 2019Fusion Steels StudyAward
07 November 2019STEP WP5 - Repair of RNC Task 5.5.2Award
07 November 2019STEP WP5 - Lead-Lithium Flow Loop Concept StudyTender
22 November 2019STEP WP5 - Fusion Power Plant - Diverter Heat Exchanger Design ChallengeAward
29 November 2019STEP WP5 - Heat Pipe Design ChallengeAward
02 December 2019STEP WP5 - Fusion Power Plant - Breeder Blanket Design ChallengeAward
10 January 2020STEP WP5 - Lead-Lithium Flow Loop Concept StudyAward
04 February 2020UKAEA Engineering Design Services FrameworkTender
11 January 2021STEP IVC - FEED and Detailed Design Study for liquid metals and molten salts corrosion test rigAward
14 December 2020STEP B1.6 SCO2 Component Level Cycle Technology AssessmentAward
23 November 2020STEP Cost Modelling PartnerAward
20 October 2020STEP B1.3 Vacuum Vessel State of the Art and Best Practice StudyAward
13 October 2020Cryogenic Material Data Capture TenderAward
12 October 2020Larger Magnet Manufacturing and Testing Considerations StudyAward
21 August 2020STEP B1.3 Vacuum Vessel State of the Art and Best Practice StudyTender
20 August 2020STEP Cost Modelling PartnerTender
03 August 2020STEP B1.6 SCO2 Component Level Cycle Technology AssessmentTender
12 May 2020UKAEA Engineering Design Services FrameworkAward
15 May 2020Larger Magnet Manufacturing and Testing Considerations StudyTender
03 June 2020Cryogenic Material Data Capture TenderTender

17 August 2021
Metal Melting/Casting Test Rig - Award

23 April 2021
Metal Melting/Casting Test Rig - Tender

26 June 2019
Provision of Architectural Consultancy Support - Tender

16 August 2019
STEP WP11 - Feasibility Study of Modular Reactor Designs - Tender

03 September 2019
STEP WP11 - Feasibility Study into the use of anodised aluminium magnets in fusion reactors - Tender

20 September 2019
Fusion Steels Study - Tender

23 September 2019
STEP WP5 - Repair of RNC Task 5.5.2 - Tender

02 October 2019
STEP WP11 - Feasibility Study of Modular Reactor Designs - Award

03 October 2019
STEP WP5 - Fusion Power Plant - Breeder Blanket Design Challenge - Tender

04 October 2019
STEP WP5 - Fusion Power Plant - Diverter Heat Exchanger Design Challenge - Tender

07 October 2019
STEP WP5 - Heat Pipe Design Challenge - Tender

31 October 2019
STEP WP11 - Feasibility Study into the use of anodised aluminium magnets in fusion reactors - Award

31 October 2019
Fusion Steels Study - Award

07 November 2019
STEP WP5 - Repair of RNC Task 5.5.2 - Award

07 November 2019
STEP WP5 - Lead-Lithium Flow Loop Concept Study - Tender

22 November 2019
STEP WP5 - Fusion Power Plant - Diverter Heat Exchanger Design Challenge - Award

29 November 2019
STEP WP5 - Heat Pipe Design Challenge - Award

02 December 2019
STEP WP5 - Fusion Power Plant - Breeder Blanket Design Challenge - Award

10 January 2020
STEP WP5 - Lead-Lithium Flow Loop Concept Study - Award

04 February 2020
UKAEA Engineering Design Services Framework - Tender

11 January 2021
STEP IVC - FEED and Detailed Design Study for liquid metals and molten salts corrosion test rig - Award

14 December 2020
STEP B1.6 SCO2 Component Level Cycle Technology Assessment - Award

23 November 2020
STEP Cost Modelling Partner - Award

20 October 2020
STEP B1.3 Vacuum Vessel State of the Art and Best Practice Study - Award

13 October 2020
Cryogenic Material Data Capture Tender - Award

12 October 2020
Larger Magnet Manufacturing and Testing Considerations Study - Award

21 August 2020
STEP B1.3 Vacuum Vessel State of the Art and Best Practice Study - Tender

20 August 2020
STEP Cost Modelling Partner - Tender

03 August 2020
STEP B1.6 SCO2 Component Level Cycle Technology Assessment - Tender

12 May 2020
UKAEA Engineering Design Services Framework - Award

15 May 2020
Larger Magnet Manufacturing and Testing Considerations Study - Tender

03 June 2020
Cryogenic Material Data Capture Tender - Tender